The Client: A renowned global technology distributor and solutions provider
The Need: Comprehensive sports stadium hardware installation services in diverse locations across the United States and other global regions
Timeframe: Commenced in September 2020 and estimated completion by December 2023
Number of Sites: 100 locations successfully executed thus far
Estimated Hours to Complete: 8-24 hours per location, varying with size and complexity
The Solution: SmartSource’s proficient field technicians undertook the meticulous installation of hardware and delivered top-notch cable installation services, strictly adhering to predetermined configurations at designated sports stadium sites. Precise verification of hardware packages, servers, IP addresses, subnet masks, default gateways, and DNS servers was meticulously conducted before the installation process commenced. Rigorous post-installation testing ensured impeccable network connectivity, while meticulously verifying camera and sound configurations for flawless performance.
Unique Challenges: Addressing international adjustments necessitated for onsite materials and equipment upon arrival, given the absence of site surveys as part of this engagement.
-Accommodating urgent requests to promptly schedule locations within the United States
-Persisting challenges posed by the ongoing COVID-19 situation
SmartSource Results:
-All predetermined locations have been impeccably completed within the agreed-upon timeline
-The project continues to progress smoothly, consistently attaining a high level of client satisfaction throughout the engagement